Complete Guide: Electrical Grid Connections in Romania

Connecting to the electrical grid is an essential step for any new building, extension or industrial project. In this detailed guide, we explain everything you need to know: from the types of connections available, to the required documents, associated costs and expected timelines.

What are electrical connections?

An electrical connection (racord electric) is the physical link between the electricity distribution network and a consumer's or energy producer's electrical installation. Essentially, the connection is the "bridge" that links your property to the national electricity grid.

A grid connection is mandatory for any property that requires electrical power, whether it's a newly built house, a commercial space, an industrial hall or a solar park. The process is regulated by ANRE (the National Energy Regulatory Authority) and must be carried out by authorized companies.

Ka Electric offers complete electrical connection services in the Timișoara area and throughout western Romania, covering all stages: from initial consultation to commissioning.

Types of electrical connections

Electrical connections are mainly classified by voltage level and consumer type:

Low Voltage Connections (LV)

Voltage: 230V (single-phase) / 400V (three-phase)

For: Houses, apartments, small offices, shops

Typical power: Up to 100 kW

Characteristics: The standard solution for residential and small commercial consumers. Involves connecting to the low voltage distribution network, usually via underground cable or overhead line.

Medium Voltage Connections (MV)

Voltage: 6 kV / 20 kV

For: Factories, warehouses, solar parks, shopping centers

Typical power: Over 100 kW

Characteristics: Required for consumers with large energy needs. Involves installing a dedicated transformer station and a larger investment, but provides more stable power supply and flexibility for future expansion.

There are also high voltage (HV) connections for very high power consumers (transformer stations, large wind farms), but these are less common and require special technical conditions.

Connections can also be classified by purpose:

  • Consumer connections – powering buildings with electricity
  • Producer connections – evacuating produced energy (solar parks, wind farms)
  • Prosumer connections – combined consumption + production (self-consumption with solar panels)

The process of obtaining an electrical connection

Obtaining an electrical connection follows a well-defined, legally regulated process. Here are the main steps:

1

Submit the connection application

Submit the application to the distribution operator (E-Distribuție, Delgaz Grid, etc.) along with required documents: property deed, urbanism certificate, site plan and technical specifications.

2

Obtain the Technical Connection Approval (ATR)

The distribution operator analyzes the application and issues the ATR within 30 calendar days. The ATR contains the technical connection solution and grid connection conditions.

3

Sign the connection contract

After receiving the ATR, sign the connection contract and pay the connection fee. This establishes the obligations of both parties and execution timelines.

4

Technical design

A detailed technical project for the connection is prepared, which must be verified and approved. The project includes cable routing, equipment sizing and construction solutions.

5

Execute the works

Construction and installation works are carried out by an ANRE-authorized company. These include: excavation, cable laying, switchboard and metering equipment installation, site restoration.

6

Acceptance and commissioning

After completion, technical acceptance is carried out together with the distribution operator, the meter is installed and the connection is commissioned. You can start using electricity.

Required documents for electrical connection

The connection file must contain the following documents:

  • Connection application – standard form from the distribution operator
  • Property deed – ownership title or lease agreement for the property
  • Urbanism certificate – issued by the local municipality
  • Site plan – updated cadastral plan with property location
  • Technical project – interior electrical installation project
  • Building permit – for new buildings or extensions
  • Mayor's certificate – for the connection route on public domain

Ka Electric can assist you in preparing the entire connection file, including obtaining the urbanism certificate and preparing the technical project. Contact us for free consultation.

Costs associated with electrical connection

The costs of an electrical connection depend on several factors: connection type (LV or MV), distance to the connection point, requested power and terrain conditions.

Connection typeEstimated cost rangeWhat's included
LV single-phase2,000 – 5,000 RONConnection fee, basic project, execution
LV three-phase3,000 – 15,000 RONConnection fee, project, execution, switchboard
MV (with transformer)20,000 – 100,000+ RONATR, complex project, transformer station, execution
Prosumer3,000 – 10,000 RONProsumer ATR, project, bidirectional meter

Important: Connection fees are regulated by ANRE and calculated based on approved power. Additional costs (design, permits, execution on client property) are added separately.

Ka Electric provides transparent quotes with detailed pricing for each stage. Request a free quote to receive an exact estimate for your project.

Execution timelines

The timelines for completing an electrical connection vary depending on project complexity:

30 days

ATR issuance by the distribution operator

2–4 months

Complete LV connection (design + execution)

6–12 months

Complete MV connection (design + transformer + execution)

Factors that can delay the process:

  • Missing or incomplete documents
  • Need for additional permits (road crossings, third-party land)
  • Difficult terrain conditions (rocky ground, groundwater)
  • Insufficient capacity in the existing grid (requires grid reinforcement)
  • Extended bureaucratic procedures at the distribution operator

With Ka Electric, you benefit from our experience in managing the entire process to ensure timelines are met. Learn more about our electrical connection services.

Why choose Ka Electric for electrical connections?

ANRE Authorized Company

We hold all necessary authorizations for designing and executing low and medium voltage electrical connections.

Over 10 years of experience

We have completed hundreds of electrical connections in the Timișoara area and throughout western Romania.

Complete turnkey services

We handle everything: consultation, documentation, design, permit acquisition, execution and acceptance.

Transparent pricing

Detailed quotes with clear pricing for each stage, no hidden costs.

FAQ

Frequently Asked Questions about Electrical Connections

Need an electrical connection?

Contact us for a free consultation and personalized quote. We handle the entire connection process, from documentation to commissioning.